
Manila Water and Maynilad open overnight service cuts in Pasig, Cainta, Antipolo, Taytay, Valenzuela, Malabon, Navotas, Quezon City and Imus from Aug. 10.
MANILA, Philippines – Manila Water Co. Inc. and Maynilad Water Services Inc. will cut water service in parts of Metro Manila, Rizal and Cavite this week for maintenance and leak-detection work, the two utilities said Sunday.
The interruptions run mostly overnight, from 10 p.m. to 4 a.m., through Aug. 14 across Pasig, Cainta, Antipolo, Taytay, Valenzuela, Malabon, Navotas, Quezon City and Caloocan. The longest disruption sits in Imus City, where capacity limits at Maynilad's Patindig Araw pumping station keep service down near-daily from Aug. 10 through Aug. 31.
Manila Water's Pasig work starts Aug. 11, when declogging clears blockages in Maybunga and Rosario villages overnight. Santolan follows Aug. 13 under the same procedure.
In Rizal, Cainta's San Juan and San Isidro lose service Aug. 10-11 while crews clean line meters and strainers along Estrella St. and Birmingham Ave. A second Cainta zone, covering Sto. Domingo, San Andres, Sta. Rosa, San Roque and Sto. Niño, goes dark Aug. 11-12 for declogging along A. Bonifacio.
Antipolo carries the largest share of the work. Mambugan and parts of Cainta face interruptions Aug. 13-14 for step testing, a leak-detection method that isolates water flow section by section to find seepage. Bagong Nayon sits without water Aug. 11-12 for meter and strainer cleaning, and Mayamot and Cupang follow the same night for step testing. Sta. Cruz runs Aug. 12-13, and Beverly, along with Taytay's Dolores, Aug. 13-14, all for step testing.
Taytay's Dolores and San Isidro lose service Aug. 10-11 for meter and strainer cleaning along Golden City Subd.
Maynilad's network work opens in Valenzuela Aug. 10-11, when Gen. T. De Leon and Parada face outages from 12:01 a.m. to 4 a.m. for maintenance on Diam St. and Prodon St. Five more Valenzuela villages, Gen. T. De Leon, Karuhatan, Malinta, Marulas and Maysan, lose water Aug. 11 for maintenance at the Parada Pumping Station and Reservoir.
Malabon's Baritan, Bayan-Bayanan, Concepcion, Dampalit, Flores and Hulong Duhat run Aug. 10-11 for leak exploration. Navotas' Tanza I and Tanza II follow the same window for leak work, while NBBS Kaunlaran in Navotas and Barangay 28 in Caloocan face pipe realignment.
Quezon City's Baesa, Bahay Toro and Tandang Sora see longer outages, 10 p.m. to 6 a.m. Aug. 10-11, for network maintenance at three points on Tandang Sora, General Ave., Quirino and Road 20.
The Imus schedule runs longest and covers the most ground. Villages across Alapan, Anabu, Bayan Luma, Bukandala, Carsadang Bago, Malagasang, Medicion, Poblacion and Tanzang Luma will have service cut from 5 a.m. to 11:59 p.m. daily between Aug. 10 and Aug. 31, a window Maynilad attributes to network and facility limitations at the Patindig Araw station.
The utilities did not say when normal service would resume beyond the listed dates.
Drafted by a large language model from the source reporting linked above, then screened by automated publishing checks. It is not read by a journalist before publication. Some articles cite our Alpha Score. Verify prices and figures against the original source. Educational coverage, not personalized advice.