
Energy Recovery Inc. will build a plant in Saudi Arabia with capacity for 2,000 units, enough to cover local demand and export 40% to GCC, Africa, and Asia.
The Saudi Water Authority (SWA) said it will build the world's first energy recovery device (ERD) factory outside the US, localizing production of a technology central to desalination. Output is set to start in the first quarter of 2027.
Energy Recovery Inc. will operate the plant with an annual capacity of 2,000 units, the Saudi Press Agency (SPA) reported. That exceeds Saudi Arabia's estimated yearly demand of 1,200 units, meaning 40% of production will go to GCC countries, Africa, and Asia.
ERDs cut the energy needed to run desalination plants. Local manufacturing reduces import dependence, shortens delivery times, and makes supply chains less vulnerable to disruption, SWA said.
The market for ERDs in Saudi Arabia is worth about SAR 247 million, SPA said. Across the Middle East and North Africa, the opportunity totals SAR 300 million. The combined figure of more than SAR 547 million supports the case for long-term production and exports.
SWA expects the factory to add SAR 137 million to GDP by 2033 and create more than 50 direct jobs. The local-content rate should exceed 80%, meaning most components and services come from inside the country.
The project, led by SWA with the Ministry of Investment, the Ministry of Industry and Mineral Resources, and the Local Content and Government Procurement Authority (LCGPA), aims to turn Saudi Arabia from an importer of ERDs into an exporter. The government sees water technology as a sector where it can build regional manufacturing heft.
Drafted by a large language model from the source reporting linked above, then screened by automated publishing checks. It is not read by a journalist before publication. Some articles cite our Alpha Score. Verify prices and figures against the original source. Educational coverage, not personalized advice.