
NHPC's Teesta Stage-VI tunnel collapse death toll reaches 22. Rescue teams using breathing apparatus search for three still trapped. Ex gratia of ₹5 lakh announced.
The death toll from the methane explosion inside NHPC's under-construction hydroelectric tunnel in Sikkim's Namchi district climbed to 22 on Wednesday, with rescue teams working around the clock to reach three more workers believed to be trapped deeper inside.
The blast occurred Monday in the seven-kilometer head race tunnel of the Teesta Stage-VI project. A pocket of methane gas in the rock strata ignited, generating intense heat, flames and toxic fumes that killed workers on the spot.
Namchi Superintendent of Police Sonam Doma Bhutia told The Indian Express that 22 bodies had been recovered so far. "If there were 25 people inside the tunnel, then around three are still inside. The rescue operation is going on 24x7."
NHPC said in a statement that its top management was at the site coordinating with all agencies. Personnel from the National Disaster Response Force, State Disaster Response Force, Sikkim Police, Army, district administration, NHPC, Patel Engineering Ltd, Eastern Coalfields Ltd and Western Coalfields Ltd are all involved.
Rescuers face severe conditions. Large sections of the tunnel are flooded with mud and water. Toxic fumes still linger, forcing teams to use breathing apparatus. Abhijit Kundu, Superintendent at Eastern Coalfields Ltd, said retrieving visible bodies was the priority. "Accumulated water makes movement very difficult."
An NDRF official said that after finishing the current recovery phase, teams would search the remaining sections of the tunnel for any other trapped workers.
NHPC has announced an ex gratia payment of ₹5 lakh to the families of each deceased. Many of the victims were residents of Malbazar in Jalpaiguri district, West Bengal.
The tunnel is part of the Teesta Stage-VI Hydroelectric Project, designed to channel high-pressure water from a reservoir to the powerhouse. The accident raises questions about safety protocols in underground construction, especially methane monitoring. NHPC's stock may come under pressure as investors weigh potential project delays, higher insurance costs, and possible regulatory scrutiny. No analyst reports have been published yet.
The rescue teams continue their search. The next update is expected once the remaining tunnel sections are cleared of debris and water.
Drafted by a large language model from the source reporting linked above, then screened by automated publishing checks. It is not read by a journalist before publication. Some articles cite our Alpha Score. Verify prices and figures against the original source. Educational coverage, not personalized advice.