
Kabwe Municipal Council has stepped up feeder road rehabilitation across 29 wards, using K3.1 million per constituency from the 2025 CDF allocation. Phase Two gravelling is underway in Zambezi and Makululu wards.
Kabwe Municipal Council has stepped up rehabilitation of feeder roads across the district, using its 2025 Constituency Development Fund allocation to improve mobility for residents.
The local authority's Engineering Department is working on roads in poor condition across all 29 wards in Bwacha and Kabwe Central constituencies, with K3.1 million allocated for each constituency this year.
During a spot check, the council's newly procured CDF road equipment was seen carrying out Phase Two of gravelling and compacting in Zambezi Ward, with similar work underway on Roads 9, 10 and 13 in Makululu Ward.
"Kabwe Municipal Council has intensified the rehabilitation of feeder roads under the Presidential Delivery Unit to ease mobility for citizens in the district," the council said in a statement.
The current phase will be followed by a rollout of works under the 2026 feeder roads rehabilitation allocation, the council added.
Prepared with AlphaScala editorial tooling from the source reporting linked above. Indexable analysis may include a cited Alpha Score value. Publishing checks screen each story before release. Educational coverage, not personalized advice.