
India will pick the first 50 airports under a modified UDAN scheme, with ₹12,159 crore in funding and state-level support requirements for viability.
India will select the first 50 airports for development under the modified UDAN regional connectivity scheme, the Ministry of Civil Aviation said, as it invites nominations from state and union territory governments. The selection is part of a broader plan to develop 100 airports and aerodromes over eight years through upgrades to existing unserved airstrips. The government has set aside an estimated ₹12,159 crore for the airport program and another ₹3,661 crore for 200 helipads in hilly, island, remote and aspirational districts.
The ministry will evaluate proposals under a challenge mode framework before finalizing the batch. The Airports Authority of India, acting as the implementing agency, will assess nominated locations alongside the ministry. Evaluation criteria include 100% encumbrance-free land, existing infrastructure readiness, technical and airspace feasibility, projected passenger traffic, regional connectivity needs and tourism potential.
State governments must commit to operational support including concessional electricity and water, free security and firefighting services, and a value-added tax on aviation turbine fuel capped at 1%, the ministry said. The scheme also provides ₹2,577 crore in operational and maintenance support to help Regional Connectivity Scheme-only airports during their first years. That financial assistance runs for three years, capped at ₹3.06 crore annually per airport and ₹0.90 crore per heliport or water aerodrome.
Sources said the support covers a portion of staffing costs for communication, navigation, surveillance and air traffic management, plus meteorological services, at up to 441 airports, heliports and water aerodromes. The modified framework also waives landing, parking and passenger-related airport charges for RCS flights, along with exemptions from terminal navigation landing charges and discounted route navigation facility charges. The goal is to improve the commercial viability of regional air services by lowering airline operating costs at smaller airports.
The first 50-airport selection is expected to set the template for later phases. The ministry has not announced a timeline for the broader 100-airport target beyond the eight-year horizon.
Drafted by a large language model from the source reporting linked above, then screened by automated publishing checks. It is not read by a journalist before publication. Some articles cite our Alpha Score. Verify prices and figures against the original source. Educational coverage, not personalized advice.