
Ministry approves ₹334.89 crore flyover to bypass nine level crossings, aiming to cut cargo evacuation time and fuel costs at Visakhapatnam Port.
India's shipping ministry approved a ₹334.89 crore flyover at Visakhapatnam Port to speed cargo movement and ease road congestion, the ministry said Tuesday.
Shipping Minister Sarbananda Sonowal said the project would remove a critical bottleneck, enabling faster cargo movement and improving operational efficiency.
The 3.584 km elevated corridor will connect Convent Junction with the Dock Area, separating road and rail traffic. The port currently has nine major railway level crossings that see about 18 gate closures a day because of high train exchange volumes.
The frequent closures cause congestion and higher fuel costs for vehicles moving cargo, the ministry said in a statement. The flyover is designed to reduce those delays and cut vehicle operating costs.
The project includes civil and electrical works, utility shifting, safety installations, and five years of maintenance. Construction will be planned to minimise disruption to port operations. The project is scheduled for completion within 30 months.
Drafted by a large language model from the source reporting linked above, then screened by automated publishing checks. It is not read by a journalist before publication. Some articles cite our Alpha Score. Verify prices and figures against the original source. Educational coverage, not personalized advice.